General Requirements:
- This Regulation comes under MARPOL Annex IV, Chapter 3 - Equipment and control of discharge, Regulation 10.
- All ships subject to Annex IV, irrespective of their size and the presence of a sewage treatment plant or sewage holding tank, shall be provided with a pipeline and the relevant shore connection flange to discharge sewage to the port sewage treatment facility.
- Both lines shall be fitted with a standard discharge connection to enable pipes to reception facilities to be connected with the ship's discharge pipeline.
- For ships in dedicated trades, i.e. passenger ferries, alternatively the ships discharge pipelines may be fitted with a discharge connection that can be accepted by the Administration, such as quick connect couplings.
- The Standard discharge connection shall be under the following table:
- The flange is designed to accept pipes up to a maximum internal diameter of 100mm and shall be of steel or other equivalent material having a flat face.
- The flange together with a suitable gasket shall be suitable for a service pressure of 600kPa
- For ships having a moulded depth of 5 meters and less, the inner diameter of the discharge connection maybe 38 millimetres.
Reference: IMO Publications & Documents - International Conventions - MARPOL - Annex IV
0 Comments
Thanks for your Valuable comments and Suggestions